So I am a little behind on my posting, sorry about that! Things have been proceeding apace here for a while, I had to make a trip back to Calgary to pick up a helper (Gabriella) and help with the packing etc. for the movers (not that I really did much Carrie had everything already taken care of by the time I got there). In any event I am finally getting back to this. :)
So I think where I left off was with the installation of the new pool liner, the next day we started to fill the pool, well we started that day with hoses which were not exactly super fast, so the next day we brought in water trucks, much faster. I have posted some shots of the pool as it was being filled below, it took two days with the hoses and the truck (8 loads with the truck).
So I think where I left off was with the installation of the new pool liner, the next day we started to fill the pool, well we started that day with hoses which were not exactly super fast, so the next day we brought in water trucks, much faster. I have posted some shots of the pool as it was being filled below, it took two days with the hoses and the truck (8 loads with the truck).
I think this was with the hoses and the first load of water.
A little more...
Almost to the shallow end...
Almost done!!! Just down to filling with hoses.
Laura (Gabs named her) checking out the pool during the filling process.
Finally all full, and the guys are working on pouring the concrete to repair all of the parts we had to dig out etc.
And finally the pool all lit up at night full of water and with the new lights on, hurray!!!